South Pars Gas Field Development Plan - Phase 14 (fourteen)

Scope of activity (work): It consists of engineering, purchase, construction works, installation and commissioning of the following units:
Unit 106-Compressor station and gas measurement
Unit 108-Recovery of sulfur
Unit 109-Acid water purification
Unit 120-Electricity (power) distribution system
Unit 121-Steam production and distribution
Unit 122 - Fuel system
Unit 123-Air supply for precision instruments
Unit 124-Nitrogen production and storage
Unit 125 - Sea water withdrawal system
Unit 126 - Desalination
Unit 127 - Water supply system without salts
Unit 128-Drinking water production
Unit 129-Industrial waste water refinement
Unit 130-Fire water system
Unit 131- Firefighting water supply and distribution system, emergency power generation system
Unit 132-Water cooling system
Unit 144 - Sulfur solidification and storage
Unit 146-Chemical storage
Unit 163-Fire building
Unit 165-Visit hall (Gallery building)
  • Main power station and transformer
  • The seawater intake system includes pumps from the inlet to the installation of the 42-inch gas outlet pipeline to the national gas transmission line of 3 kilometers long
  • Equipping the workshop and carrying out building works and construction of administrative offices
  • The pipelines of the units along with the related structures